Toot

Written by Richard Siggs on 2025-02-01 at 08:22

I think AEMO are restricting the interconnecters between SA & VIC, to limit how much power VIC gives us in SA at the moment.

I guess VIC needs every megawatt it’s got tonight too!

Causing SA power prices to spike.

=> =

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1700 hrs on 1 February 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 1 February 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1700 hrs on 1 February 2025.

This constraint set contains an equation with the following interconnectors on the LHS:

V-S-MNSP1

V-SA

=> More informations about this toot | View the thread | More toots from RichardSiggs@aus.social

Mentions

Tags

Proxy Information
Original URL
gemini://mastogem.picasoft.net/toot/113927661796029331
Status Code
Success (20)
Meta
text/gemini
Capsule Response Time
216.964005 milliseconds
Gemini-to-HTML Time
1.057467 milliseconds

This content has been proxied by September (3851b).