Toot

Written by satterle on 2025-01-10 at 20:36

Slowly moving ahead with the frame project. Pics: the basic assembly set up; a frame in strap clamps - the plywood template is the size of the paintings; clamping on slats to attach the painting to the frame; and a stand with frames in various stages.

They're finished with two coats of iron acetate stain and two coats of water poly mixed 2 parts poly 1 part water.

Two challenges. 1) having issues with a rotator cuff 2) shop is so small, can't do anything else!

[#]woodworking

=> View attached media | View attached media | View attached media | View attached media

=> More informations about this toot | View the thread | More toots from satterle@newsie.social

Mentions

Tags

=> View woodworking tag

Proxy Information
Original URL
gemini://mastogem.picasoft.net/toot/113805976071319722
Status Code
Success (20)
Meta
text/gemini
Capsule Response Time
231.193258 milliseconds
Gemini-to-HTML Time
0.756613 milliseconds

This content has been proxied by September (3851b).