Toot

Written by John Hawthorn on 2024-08-13 at 18:17

For comparison above is a graph with 50 points vs below measuring 300 points at a regular interval (it has a slightly different X axis... I made a mistake). I think the old version looks better but the new version was way faster to generate and it more precisely narrows down the specific commit(s) which caused a change (rather than an interval, which I'd then have to bisect).

=> View attached media

=> More informations about this toot | View the thread | More toots from john@hawthorn.pub

Mentions

Tags

Proxy Information
Original URL
gemini://mastogem.picasoft.net/toot/112956083183309313
Status Code
Success (20)
Meta
text/gemini
Capsule Response Time
477.978146 milliseconds
Gemini-to-HTML Time
0.366307 milliseconds

This content has been proxied by September (3851b).