And so overall, the real argument that I feel is left out in the BS meter infographics is that there isn't enough population to warrant the cost of building a 350 km/h track between the two cities.
(Whether it involves viaduct / tunnels or ground level, it would still be too expensive relative to the passenger numbers).
=> More informations about this toot | More toots from Sobex@sciences.re
text/gemini
This content has been proxied by September (ba2dc).