Written by Tom 🇨🇦 on 2024-12-09 at 15:08

This is very revealing. The OP on Instagram (TheTransitGuy) attributes this to a lack of in-house capacity here in North America. I would add that the costly line items shown within soft costs are likely the main causes of the outrageously long timelines for Metrolinx projects.

[#]StolenFromInstagram #TheTransitGuy

[#]toronto #ontario

[#]transit

[#]TransitFail